Offshore Support
Offshore and vessel preparation
- Ready to pay out
- Connecting Pulling Head to Cable
- Inserting Cable to Tensioner ( Cable machinery ) and passing from cable tower
- Preparation of floating buoy to connect on cable
- Calculation of required No. of Buoy for floating cable
- Preparation of floating buoy to connect on cable
- Vessel will be positioned as close as possible to shore and on proposed route.